Petrochemical Projects
Imperial Oil Limited, B&C Control Room
This fixed tender project consisted of renovating and adding an addition to an existing control room located in the Imperial Oil Refinery in Sarnia. This labour intensive project was completed while keeping the original control room intact while the rest of the building was demolished and rebuilt.
Blast wall construction was added by installing 9” thick reinforced concrete panels around the exterior of the building structure. Metal cladding was then installed to give the building an architectural look while keeping the safety of its personnel with the blast walls added.
Two sets of locker, lunch and control rooms where completed for the staff in the facility. This project was completed in 2004 with an overall cost of 3.8 million dollars.
Praxair Canada – Compressor Building
Praxair Canada required a compressor building located in the Suncor Ethanol plant on Rokeby Line in Corunna. Dixin Construction Limited was the successful bidder for this project.
This project consisted of an American Buildings pre-engineered building that included two parts. Part one which is a gable end structure is the main building. Part two which is single slope building houses the control and electrical room.
Dixin Construction also completed all of the concrete related foundations for the various Praxair process equipment. A 5-ton runway crane was installed to service the building during shutdown and maintenance.
This project was recently completed in summer of 2007.
Bayer Rubber Inc.
The Bayer general contracting project consisted of the following tasks;
- Central Change Facility
- 32,000 square foot Building for Locker Rooms, Showers and Change Rooms
- Demolition
- Site Work
- Concrete
- Masonry
- Interior Finishes
HC Stark Limited
The Bayer general contracting project consisted of the following tasks;
- Nickel Hydroxide & Tungsten Buildings
- Two Floor Conventional Steel Structures
- Sub Contractor for Architectural Finishes
- Concrete
- Masonry
- Interior Finishes
- Doors & Hardware
Novacor Chemicals
The Novacor Chemical project consisted of the following tasks;
- Styrene II Administration Building
- Two Floor Office Building
- Sub Contractor for Foundations & Floor below Grade
- Concrete
- Site Work